Tie down, Tie down -14 – JLG 860SJ Operator Manual User Manual
Page 72
SECTION 4 - MACHINE OPERATION
4-14
– JLG Lift –
3121138
Tie Down
WHEN TRANSPORTING THE MACHINE, THE BOOM MUST BE FULLY
LOWERED INTO THE BOOM REST.
1. Remove all loose items from the machine.
2. When transporting an 800S/860SJ a step-deck or sin-
gle-drop trailer is required. To avoid damage to the plat-
form and to obtain proper weight distribution, load the
machine onto the trailer as follows;
a. Position the boom over the front wheels.
DO NOT SWING THE BOOM WHIT THE MACHINE POSITIONED ON A
TRAILER. TIPOVER MAY RESULT
b. Place the boom in the stowed position with the turn-
table locked.
DRIVE AND STEER CONTROLLERS WILL BE REVERSED WHEN THE
BOOM IS POSITIONED OVER THE FRONT WHEELS.
c. Drive it onto the trailer with the boom and platform
positioned towards the truck. Refer to Figure 4-5.,
Typical 800S/860SJ Transport.
3. Secure the chassis and the platform using straps or
chains of adequate strength.