Service, Torque chart, Service tools – MBW R422 User Manual
Page 10: General, Handle removal, Engine removal, Ervice, Torque chart service tools general
- 7 -
S
ERVICE
Assembly and disassembly should be performed by a
service technician who has been factory trained on MBW
equipment. The unit should be clean and free of debris.
Pressure washing before disassembly is recommended.
• Prior to assembly, wash all parts in a suitable cleaner or
solvent.
• Check moving parts for wear and failure. Refer to the
Replacement section in this manual for tolerance and
replacement cycles.
• All shafts and housings should be oiled prior to pressing
bearings. Also, ensure that the bearings are pressed
square and are seated properly.
• All bearings should be replaced when rebuilding any
exciter or gearbox.
• All gaskets and seals should be replaced after any
disassembly.
Torque Chart
Service Tools
General
The disassembly and assembly procedures given on the
next few pages are intended for a complete dismantling of
the rammer. Read the following sections carefully. It is not
necessary to follow the complete disassembly procedure
when only partial disassembly is required. If repairs have to
be made to the Lower Assembly only, it is recommended
that the drive unit (engine, gearbox and handle) be removed
from the lower unit. See “Lower Unit Disassembly”.
Handle Removal
Refer to (HL) Handle Assembly, page 20.
1.
Turn the fuel valve (#10) to the “off” position.
2.
Loosen the hose clamp (#2) at the engine end of the
fuel line (#8). Disconnect the fuel line.
3.
Remove the flat head screws (#19) holding the
throttle (#15) to the handle (#16).
4.
Remove the four flange head cap screws (#22) and
flange nuts (#23) securing the handle to the torsion
mounts (#4).
5.
Lift the handle (#16) from the rammer.
Engine Removal
NOTE: It is not necessary to remove the handle to take
the engine off the machine.
Refer to Engine Assembly, page 21.
1.
Follow steps 1 through 3 under “Handle Removal“.
2.
For models with large air cleaner (HA), remove clamp
from air tube and disconnect air tube from engine.
3.
While supporting the engine, remove the four hex
flange nuts (#12) holding the engine (#11) and engine
adapter plate (#2) assembly to the studs (#1) in
gearbox.
4.
Remove the engine assembly from the rammer.
SIZE
GRADE 2
GRADE 5
GRADE 8
1/4-20
49 in
•
lbs
76 in
•
lbs
9 ft
•
lbs
1/4-28
56 in
•
lbs
87 in
•
lbs
10 ft
•
lbs
5/16-18
8 ft
•
lbs
13 ft
•
lbs
18 ft
•
lbs
5/16-24
9 ft
•
lbs
14 ft
•
lbs
20 ft
•
lbs
3/8-16
15 ft
•
lbs
23 ft
•
lbs
33 ft
•
lbs
3/8-24
17 ft
•
lbs
26 ft
•
lbs
37 ft
•
lbs
7/16-14
24 ft
•
lbs
37 ft
•
lbs
52 ft
•
lbs
7/16-20
27 ft
•
lbs
41 ft
•
lbs
58 ft
•
lbs
1/2-13
37 ft
•
lbs
57 ft
•
lbs
80 ft
•
lbs
1/2-20
41 ft
•
lbs
64 ft
•
lbs
90 ft
•
lbs
9/16-12
53 ft
•
lbs
82 ft
•
lbs
115 ft
•
lbs
5/8-11
73 ft
•
lbs
112 ft
•
lbs
159 ft
•
lbs
5/8-18
83 ft
•
lbs
112 ft
•
lbs
180 ft
•
lbs
3/4-16
144 ft
•
lbs
200 ft
•
lbs
315 ft
•
lbs
1-8
188 ft
•
lbs
483 ft
•
lbs
682 ft
•
lbs
1-14
210 ft
•
lbs
541 ft
•
lbs
764 ft
•
lbs
1-1/2-6
652 ft
•
lbs
1462 ft
•
lbs
2371 ft
•
lbs
M 6
3 ft
•
lbs
4 ft
•
lbs
7 ft
•
lbs
M 8
6 ft
•
lbs
10 ft
•
lbs
18 ft
•
lbs
M 10
10 ft
•
lbs
20 ft
•
lbs
30 ft
•
lbs
CONVERSIONS
in
•
lbs x 0.083 = ft
•
lbs
ft
•
lbs x 12 = in
•
lbs
ft
•
lbs x 0.1383 = kg
•
m
ft
•
lbs x 1.3558 = N
•
m
Part No.
Description
01629
Rubber Test Mat
07205
Bellows Installation Tool
07552
Blind Hole Bearing Puller Tool
20194
Service Kit
20260
Spring box Tool