Owner’s manual, Assembly – Steele Products SP-GG350 User Manual
Page 14
Owner’s Manual
13
Assembly
Handle Installation.
Floor Mount Instalation
Start by installing the handle on the
frame with two 8mm bolts.
Then install the handle retainer as
shown.
This generator has an option of not using the mobility kit.
If this is desired, just install the 4 rubber mounts on the
frame as shown. (this is why there are 6 mounts).
If you want to use the mobility kit, save the 4 mounts
in a safe place, and continue to the “mobility kit
installation.” section.
Here is a picture of the floor
mounts installed.