beautypg.com

Owner’s manual, Assembly – Steele Products SP-GG350 User Manual

Page 14

background image

Owner’s Manual

13

Assembly

Handle Installation.

Floor Mount Instalation

Start by installing the handle on the
frame with two 8mm bolts.
Then install the handle retainer as

shown.

This generator has an option of not using the mobility kit.
If this is desired, just install the 4 rubber mounts on the
frame as shown. (this is why there are 6 mounts).
If you want to use the mobility kit, save the 4 mounts
in a safe place, and continue to the “mobility kit
installation.” section.

Here is a picture of the floor
mounts installed.