ARB RD99 User Manual
Page 3
![background image](/manuals/545499/3/background.png)
Table of Contents:
1
1 Introduction
3
1.1 Pre-Installation Preparation
3
1.2 Tool-Kit Recommendations
4
1.3 Assembly Type Identification
5
2 Removing the Existing Differential
6
2.1 Vehicle Support
6
2.2 Differential Fluid Drain
6
2.3 Removing the Axles
7
2.4 Marking the Bearing Caps
7
2.5 Checking the Current Backlash Amount
8
2.6 Removing the Differential Carrier
9
3 Installing the Air Locker
10
3.1
Installing the Carrier Bearings
10
3.2
Re-Mounting the Ring Gear
11
3.3
Drilling and Tapping the Bulkhead Port
12
3.4
Checking for Assembly Clearance
13
3.5
Checking the Backlash
15
3.6
Assembling the Seal Housing
16
3.7
Profiling the Seal Housing Tube
18
3.8
Setting Up the Bulkhead Fitting
19
3.9
Bench Testing the Air Locker
21
3.10
Reinstalling the Differential and Axles
22
4 Installing the Air System
23
4.1 Mounting the Solenoid
23
4.2 Running & Securing the Air Line
25
4.3 Connection to the Bulkhead Fitting
26
5 Mounting & Connecting the Electrical System
28
5.1 Mounting the Actuator Switch(es)
28
5.2 Wiring the Actuator System
29
6 Testing & Final Assembly
33
6.1 Leak Testing
33
6.2 Testing the Air Locker Actuation
34
6.3 Re-Sealing & Filling the Differential
34
6.4 Post-Installation Check List
35
7 Parts List
37
7.1 Exploded Assembly Diagram
37
7.2 Itemized Parts List
38