beautypg.com

7 testing & final assembly, Post-installation check list – ARB RD158 User Manual

Page 41

background image

7 Testing & Final Assembly

39

7.4

Post-Installation Check List

Now that the Air Locker installation has been completed, ARB
recommends that you take the time to complete the following check list
just to insure that you haven’t missed any of the vital steps.


c The air system has been leak tested.

c Thread locking compound was used on the ring gear bolts.

c All torque settings comply with the vehicle manufacturer’s specs

and were set with an accurate torque wrench.

c Differential fluid complies with ARB recommendations and has

been filled to the correct level.

c All air lines and wiring have been securely cable tied to resist

snagging.

c Switch(es) have been securely mounted within operator reach, yet

well away from danger of accidental engagement.

c Switch(es) function correctly and illuminate to indicate that Air

Locker(s) have been engaged.

c All operators who are to use the Air Locker have read, and fully

understand the ARB Air Locker Operating & Service Manual.

c The Air Locker Warning Sticker has been located within close

proximity of the actuator switch(es).


INSTALLATION PERFORMED BY:

DATE OF INSTALLATION:

ODOMETER READING:

ARB AIR LOCKER SERIAL No:

___________________________

___________________________

___________________________

___________________________