Fluid Management NSC50 Harbil User Manual
Page 8

Fluid Management
®
8
ASSEMBLY & INSTALLATION
turntable to the next position.
9. Repeat steps 3-6 for each of the remaining canisters until all are
installed.
10. After completing canister assembly, connect machine to power, and turn
on the agitation switch. Verify that all the agitation blades are turning
properly.
Figure 4 SECURING CANISTER