beautypg.com

Step 3: prepare duct cutouts in cabinet – Bosch DHD User Manual

Page 11

background image

Page 9

STEP 3: Prepare Duct Cutouts in Cabinet

Figure 9: Cabinet Cutout for Ductwork

Table 4: Cabinet Cutout Dimensions

Countertop
Surface

Point "P" (Center of Rear Cut-line)

Cabinet Back

Cabinet Bottom Shelf

Left Side

Note: Centerlines of
Rectangular Duct Shown

Plumb line to
intersection A-A
& B-B

Receptacle
Location

Right Side

A. Refer to Figure 9. Drop a plumb-line from Point "P" at

the rear center of the countertop cutout. Mark this point
on the bottom of the cabinet below. Construct two
reference lines through this point: one should be parallel
to the cabinet front and directly below the rear counter-
top cutout (Line A-A), and the other (Line B-B) should
be at right angles to A-A.

B. Using these reference lines as a base for the measure-

ments shown in Table 4, layout the necessary cabinet
cutouts needed to implement the planned ductwork
route. Where a range of measurements is noted,
choose a measurement that allows best clearance from

wall studs, floor joists, utilities, or other obstructions.

C. Temporarily set intake and cooktop in place and attach

integral blower (or duct transition fitting if a remote
blower is installed). Refer to steps 6 and 7. Verify that
the duct cutouts as marked will match the hardware
installation. Adjust the duct cutout as necessary to
match hardware installation.

D. Remove temporarily placed hardware and make cutouts

in cabinet to accommodate ductwork installation.

E. Make all other cabinet modifications needed to provide

proper clearances for drawers or removable shelving.

C

D

E

F

G

"

8

/

3

6

"

2

/

1

4

1

"

8

/

7

1

"

2

/

1

5

1

"

4

/

3

9

Cabinet Cutout Dimensions for Blower:

E

Adjustable
Within Range