beautypg.com

Caution – New Buck Corporation 18 User Manual

Page 32

background image

Figure 12



For ceiling exit using close clearance listed chimney

1. Suspend a plumb bob from the ceiling above the unit so that the weight is hanging in the

center of the flue exit. (A small weight on a string will serve as a plumb bob.) Mark
the ceiling where the string is suspended to locate the center of the chimney hole.


2. After locating the center of the hole install the ceiling support box, chimney, flashing and

rain cap using listed chimney only. Only use pipe listed in this manual.

CAUTION


REFER TO CHIMNEY MANUFACTURER’S INSTRUCTIONS FOR ASSEMBLY
AND DISASSEMBLY OF CHIMNEY PARTS. BE SURE TO FOLLOW CHIMNEY
INSTRUCTIONS FOR PROPER CLEARANCES TO COMBUSTIBLE AND PROPER
AIR SPACING REQUIRED
.


3. Add additional pipe until both of the following are met:
(a) Chimney pipe is 3 feet higher than roof at the point where it penetrates the roof and

24" min.

(610 mm)

OUTSIDE AIR DUCT THROUGH FLOOR WHEN

MOBLE HOME IS NOT UNDERPENNED

RAIN CAP

FLASHING

RADIATION SHIELD

24" min.
(610 mm)

OUTSIDE AIR DUCT THROUGH UNDERPENNED

RAIN CAP

FLASHING

RADIATION SHIELD

36" TYP.

36" TYP.

20 FT. MAX.

30