beautypg.com

Electrical requirements (cont.), Electrical hook-up – Bunn Dual TF DBC With Smart Funnel DUAL068000 User Manual

Page 5

background image

Page 5

120/208 and 120/240 volt ac

single phase, 60 Hz models

Note: This electrical service consists

of 3 current carrying conductors

(Neutral, L1 and L2) and a separate

conductor for earth ground.

L2

N

L1

G

L2 RED

WHITE

GREEN

GREEN

NEUTRAL

L1 BLACK

L2 RED

WHITE
NEUTRAL
L1 BLACK

200 and 230 volt ac

single phase, 60 Hz models

Note: This electrical service

consists of 2 current carrying

conductors (L1 and L2) and a

separate conductor for earth

ground.

ELECTRICAL REQUIREMENTS (cont.)

L2 RED

200 or

230V

GREEN

L1 BLACK

GREEN

35058.2 022410

ELECTRICAL HOOK-UP

WARNING – If brewer is equipped with a power cord and it is ever damaged, it must be replaced by the manu-

facturer or authorized service personel with a special cord available from the manufacturer or its authorized

service personel in order to avoid a hazard. Improper electrical installation will damage electronic components.

Damage caused by incorrect electrical connections is not covered by warranty.

1. An electrician must provide electrical service.

2. Using a voltmeter, check the voltage and color coding of each conductor at the electrical source.

NOTE - Brewers shipped with a power cord are shipped without a plug on it. Qualified service personnel

must select and install the proper UL listed grounding type attachment plug specified on the rear of the

brewer.

3. Install the specified plug on the attached power cord.

4. Remove the access panel beneath the sprayheads to gain access to the terminal block.

5. Brewers not equipped with a power cord, feed the wire through the strain relief and connect it to the termi-

nal block.

6. Using the above diagrams, connect the desired electrical service to the field wiring terminal block.

7. If wiring the machine for operation on 120/208 or 120/240 volts with a Power Supply Cord, the Power

Supply Cord must be UL Listed Flexible Cord Type SO, SJO, SJTO, HSJO or SJOW, No. 12 AWG, 4 Con-

ductor, Rated 90° C. Attachment Plug Cap must be UL Listed, NEMA 14-20P or L14-20P Configuration,

Rated 125/250V, 20 AMPS. The Power Supply Cord must be at least 3 feet long and maximum 6 feet long

(measured from Strain Relief to end of the Attachment Plug Cap).

8. Connect the brewer to the power source and verify the voltage at the terminal block before proceeding.

9. Set toggle switch on component bracket to the appropriate position and replace the access panel.

10. If plumbing is to be hooked up later be sure the brewer is disconnected from the power source. If plumb-

ing has been hooked up, the brewer is ready for Initial Set-Up.

WARNING – Electrical connections must be made as specified above. Failure to follow these instructions can

result in personal injury, property or equipment damage.