Bunn CDBCF Airpot User Manual
Page 19

Page 19
TROUBLESHOOTING (cont.)
PROBLEM
PROBABLE CAUSE
REMEDY
BREWING CIRCUIT (cont.)
Dry coffee grounds remain in the
funnel
1. Sprayhead
2. Funnel loading
Make sure sprayhead is present and
holes are clear and unobstructed.
There should be separate streams
of water coming out of each hole in
the sprayhead.
The BUNN
®
paper filter must be
centered in the funnel and the bed
of grounds leveled by shaking gen-
tly.
29253 111103
See also other documents in the category Bunn Coffee machines:
- A-10 (12 pages)
- CEZ-TS (32 pages)
- CDBC-DV (37 pages)
- CWT APS (2 pages)
- CWT-TSR (33 pages)
- CWT-TS (24 pages)
- CRT5 CRTF5 (32 pages)
- CWTF-TSR-MV (31 pages)
- Dual Voltage Models Starting at Serial #CDBC024477 CDBCF TC (32 pages)
- CRT5 (32 pages)
- XL M-2 (2 pages)
- CDBCF15-TC (2 pages)
- C (59 pages)
- C (32 pages)
- ESPRESS ES2C (17 pages)
- VPR (17 pages)
- CRT5 (7 pages)
- WL2 (2 pages)
- A10 Automatic (6 pages)
- 120/208V (2 pages)
- EASY POUR WX1 (2 pages)
- ES2SA (35 pages)
- BT10 (3 pages)
- TU3Q-EZ (22 pages)
- TWIN APS (32 pages)
- DUAL GPR-DBC WITH SMART FUNNEL 41343 (38 pages)
- VP17A (24 pages)
- VP17A (8 pages)
- AXIOM BREWWISE 39131.0004B (19 pages)
- CEZF CDBC (36 pages)
- VLPF (28 pages)
- BX-B (16 pages)
- ESPRESS ES.1AF (12 pages)
- 37614 041410 (7 pages)
- CWTF TWIN (35 pages)
- VPR TC (12 pages)
- Titan Single Brewer (2 pages)
- AutoPOD Brewer 41167.0001B (13 pages)
- Coffee Warmer (3 pages)
- CWTF-TC (1 page)
- VPR VPS (5 pages)
- BTC (12 pages)
- Tiger Super Automatic Espresso Machine with Steam Wand XL S-2 (2 pages)
- CWT APS-DV (31 pages)
- Dual TF DBC (56 pages)