beautypg.com

Bryant Two-Speed Puron Plus Air Conditioning Unit 598B User Manual

Page 14

background image

XIII.

FINAL CHECKS

IMPORTANT:

Before leaving job, be sure to do the following:

1. Ensure that all wiring and tubing is secure in unit before

adding panels and covers. Securely fasten all panels and
covers.

2. Tighten service valve stem caps to 1/12 turn past finger

tight.

3. Leave Owner’s Manual with owner. Explain system opera-

tion and periodic maintenance requirements outlined in
manual.

4. Fill out Dealer Installation Checklist and place in customer

file.

CARE AND MAINTENANCE

For continuing high performance and to minimize possible equip-
ment failure, periodic maintenance must be performed on this
equipment. Frequency of maintenance may vary depending upon
geographic areas, such as coastal applications.

Fig. 14—View from Top of Base Pan

A02218

Control Box
Side of Unit

THERMISTOR PLACED
UNDERNEATH BASE PAN
(ATTACHED TO BASE PAN
WITH ADHESIVE)

—14—