START-UP CHECKLIST

I. PRE-START-UP:

VERIFY THAT ALL PACKING MATERIALS HAVE BEEN REMOVED FROM UNIT
VERIFY INSTALLATION OF INDOOR FAN MOTOR ADJUSTMENT BOLT AND PLATE
VERIFY INSTALLATION OF OUTDOOR AIR HOOD
VERIFY THAT CONDENSATE CONNECTION IS INSTALLED PER INSTRUCTIONS
VERIFY THAT ALL ELECTRICAL CONNECTIONS AND TERMINALS ARE TIGHT
CHECK THAT FILTERS AND SCREENS ARE CLEAN AND IN PLACE
VERIFY THAT UNIT IS LEVEL
CHECK FAN WHEEL AND PROPELLER FOR LOCATION IN HOUSING/ORIFICE, AND VERIFY SETSCREW

IS TIGHT

VERIFY THAT FAN SHEAVES ARE ALIGNED AND BELTS ARE PROPERLY TENSIONED
VERIFY THAT SCROLL COMPRESSOR IS ROTATING IN THE CORRECT DIRECTION
VERIFY THAT CRANKCASE HEATER HAS BEEN ENERGIZED FOR 24 HOURS

II. START-UP:

ELECTRICAL

SUPPLY FAN AMPS

EXHAUST FAN AMPS

TEMPERATURES

OUTDOOR-AIR TEMPERATURE

F DB (Dry-Bulb)

RETURN-AIR TEMPERATURE

F DB

F WB (Wet-Bulb)

COOLING SUPPLY AIR

F

ELECTRIC HEAT SUPPLY AIR (IF SO EQUIPPED)

F

PRESSURES

VERIFY REFRIGERANT CHARGE USING CHARGING CHART ON PAGE 29.

GENERAL

ECONOMI$ER MINIMUM VENT AND CHANGEOVER SETTINGS TO JOB REQUIREMENTS (IF SO EQUIPPED)
VERIFY INSTALLATION OF ALL OPTIONS AND ACCESSORIES

MODEL NO.:

SERIAL NO.:

DATE:

_

TECHNICIAN:

SUPPLY VOLTAGE

L1-L2

L2-L3

L3-L1

COMPRESSOR AMPS — COMPRESSOR NO. 1 L1

L2

L3

— COMPRESSOR NO. 2

L1

L2

L3

ELECTRIC HEAT AMPS (IF SO EQUIPPED)

L1

L2

L3

REFRIGERANT SUCTION

CIRCUIT NO. 1

PSIG

CIRCUIT NO. 2

PSIG

REFRIGERANT DISCHARGE CIRCUIT NO. 1

PSIG

CIRCUIT NO. 2

PSIG