Dealer preparation check list – Bush Hog 2175 User Manual
Page 5
![background image](/manuals/48459/5/background.png)
DEALER PREPARATION CHECK LIST
2165, 2175, 2185 and 2195 BACKHOES
BEFORE DELIVERING MACHINE - The following check list should be completed.
Use the Operator’s Manual as a guide.
❑
Machine properly assembled.
❑
All safety decals readable (See decal page).
❑
All bolts tightened to torque specifications given in the torque chart.
❑
Machine operates properly.
❑
Operator’s manual has been delivered to owner and he has been instructed
on the safe and proper use of the backhoe.
Dealer’s Signature
CAUTION:
It is recommended that the tractor be equipped with Rollover
Protection System (ROPS) and seat belt be used for all
implement operations.
.
It is the responsibility of the dealer to complete the procedures listed
above before delivery of this implement to the customer.
THIS CHECKLIST TO REMAIN IN OWNER’S MANUAL
3