Bloomfield 8792 User Manual
Page 7

INSTALLATION INSTRUCTIONS (continued)
NOTE: This equipment must be 
installed to comply with 
applicable federal, state and 
local plumbing codes and 
ordinances. 
 
WARNING ELECTRIC 
SHOCK HAZARD: 
 
Brewer must be properly 
grounded to prevent possible 
shock hazard. DO NOT 
assume a plumbing line will 
provide such a ground. 
Electrical shock will cause death 
or serious injury. 
 
 
IMPORTANT: Do not connect 
brewer to electrical power until 
both tanks are filled with water. 
Pour water into each pour-over 
opening until water flows from 
the respective brew head. 
 
IMPORTANT: 
Supply power must match 
nameplate for voltage and 
phase. Connecting to the 
wrong voltage will damage the 
brewer or result in decreased 
performance. Such damage is 
not covered by warranty. 
NSF requires that the brewer be able to be moved for cleaning 
underneath. A flex line or loops of copper tubing will satisfy this 
requirement. See Figure 2 below. 
 
 
 
 
 
 
 
 
 
 
 
 
 
In some areas, local codes require a backflow preventer (check 
valve) to be installed on the inlet water line. If a backflow 
preventer is used, you must install a water hammer arrester in 
the incoming line, between the backflow preventer and the 
brewer inlet, as far away from the brewer as space will allow. 
This will relieve the excessive back pressures that can cause 
faucet leaks and solenoid malfunctions. 
 
ELECTRICIAN’S INSTALLATION INSTRUCTIONS 
 
REFER TO ELECTRICAL SPECIFICATIONS - Page 1 
Check the nameplate to determine correct electrical service 
required for the Brewer to be installed. 
 
IMPORTANT: Before connecting to electricity, make sure 
automatic brewers are connected to the water supply. 
 
Gourmet 1000™ dual brewers must be wired by an electrician. 
Model 8792 requires a 120/240V 20A circuit (50/60 Hz, L1, L2, 
Neut. plus Ground). 
 
Remove front panel to gain access to terminal block. Green 
terminal must be connected to a suitable building ground. Circuit 
must be capable of 4000 Watts. See figure 3 at right. 
 
 
 
 
 
 
 
 
IMPORTANT: Wiring must be installed in approved solid or 
flexible conduit, and must be secured to the brewer with a strain 
relief (to be provided by the installer). 
Fig. 3 115/230 Volt Terminal Block
Fig. 2 Water Supply Installation
5
625
75873
Owner
s M
anual G
ourmet
1000 Dual
Airpo
t Br
ewers
