Startłup inspection form – Baldor GLC GENERATOR GLC45 User Manual
Page 109

Series GLC A-33
MN2408
Start–up Inspection Form
It is required that both sides of this form be completed, signed where indicated and
returned to Baldor Generators within 30 days of initial Start–up and test.
It is your responsibility to deliver copies to:
n Baldor Generators Factory n Baldor Distributor n Customer
For Standby, Automatic Emergency and Prime Power Generators
Distributor Information
End User / Owner Information
Name:
Name:
Address:
Address:
Phone:
Phone:
Model Number:
Job Number:
_______
RPM _______ Hz _______ P.F.
Standby
Continuous
_______
kW _______ Volts
_______
KVA _______ Amps.
Engine Model #:
Generator Model #:
Engine Serial #:
Generator Serial #:
List Items Installed by Distributor:
List Items Installed by Others:
Engine Hour
Meter
Power
Output kW
Voltage (Phase-to-Phase)
Current
Oil Temp.
Oil
Pressure
Water
Temp
Ambient
Temp
Meter
Output kW
No Load
1-2
2-3
3-1
1
2
3
Hz
Pressure
Temp.
Temp.
Start-up Performed by:
Address:
Phone:
Date:
Technician:
Customer Signature: