Installation fixture of outdoor unit, Dimensions for parallel units installations, Pipelines connection – Amcor UCHW-H24AF2 User Manual
Page 20: Ordinary pipelines connection
4
*
Installation fixture of outdoor unit
*
INSTALLATION & REPAIR GUIDE
Split Wall-Mounted air conditioner
Inspections:
a. Check if the hooks at the top and bottom
are firmly fixed.
b. Check if the position of the master unit is
properly leveled.
c. The drain pipe should not curve upward
(Fig.5).
d. The drain pipe should be at the lower part
of the wall pipes (Fig. 5).
Drain pipe
Connecting wires
Connecting pipe
Wall pipe
Drain pipe
Fig.5
* Try to ship the product to the installation location in its original package;
* As the gravity center of the unit is not at the installation center, special caution should be taken
when using hoisting cables to lift it up;
* During shipping, the outdoor unit must not be slanted to over 45 degrees (Do not store the unit
in a horizontal way).
* Use expansion bolts to fix the mounting supports on the wall;
* Use bolts and nuts to fix the outdoor unit firmly on the supports and keep on the same level;
* If the unit is installed on the wall or at the rooftop, the supports have to be firmly fixed so as to
resist earthquake or strong wind.
Dimensions for parallel units installations
300mm(1')min
*
Pipelines connection
*
*Ordinary pipelines connection
(it is suitable for non-quick coupler)
No dust ,foreign articles,air or moisture should be allowed to enter the air conditioning system.Careful
attention should be paid when pipeline connection for outdoor unit is made.Try to avoid repeated
curves as much as possible,otherwise hardening or cracks might be caused to the copper pipes.Suitable
wrenches should be used when the pipeline connection is done so as to ensure appropriate torque(refer
to following torque Table 1).Excessive torque might damage the joints while too little torque might
lead to leakage.