beautypg.com

3 installation – Nilfisk-ALTO 20 User Manual

Page 37

background image

6

CENTIX 60

english

Rule 1
The tubes (1) can be installed vertically or horizontally. If the tubes
are installed horizontally, ensure that they slope downwards toward
the vacuum unit.

Rule 2
Always install a short 90° elbow (12) after the socket (10) and the
installation frame (11). This prevents long items from being sucked
in. Note: attach long limb to tube system, and short limb to installa-
tion frame.

Rule 3
Fit the tubes together without adhesive (13) first and check the
distances and flow directions. If possible, route entire tube system,
connect up and check. Start gluing the vacuum sockets when every-
thing is correct.

Rule 4

When checking as described in
rule 3:
Mark the tube connecting posi-
tions

At the end of each tube

On tube elbows that are

different relative angles. If

the elbows are to be at a

relative angle of exactly

45° or 90°, the marks that

are stamped into the tube

elbows can be used.

Rule 5

Always cut tubes at right angles.
Use a tube cutter or a mitre.

Rule 6

Trim sawn or cut edges. Use
a burr-removing knife or sharp
penknife.

3 Installation

The text figures in brackets relate to the table in section 1 “Contents of installation kit”.

3.1 Suction

tube

installation

3.1.1 General rules when

installing suction tubes

This manual is related to the following products: