Maintenance & testing – American Power Conversion 60-80kW 208/480V User Manual

Page 30

background image

30

User Guide APC Silcon 60-80kW 208V/480V UPS

990-4035

Maintenance & Testing

If the UPS is to be taken out of operation for an extended period, disconnect the battery in order
to prevent discharging. For details, refer to Installation Guide.

Action

1. Press

2. Press or

until

3. Press

4. Press

5. Wait about 1 sec.

6. Wait until backup times

expires and a short
alarm sounds. (No alarm
in battery monitor test
if battery is OK)

7. Press

8. Press

Display shows

Description

"xxx" is back-up time from last test –
if no previous test has been performed
or if the test has been aborted the
display will read"???"!
A battery monitor test can be performed
in the same way by selecting "Battery
monitor test" in the display.
However, this test will not start, unless
the battery is fully charged

The next step starts up the test!
To abort press

Starts the battery test.
(To interrupt a running test – perform
point 1-2 and then press key
and )

"xxx" is obtained back-up time
in minutes. (Battery capacity test only)

Exits the parameter stack
If not operated the system will automati-
cally exit after 30 seconds.

Battery capacity

test : xxx

Battery capacity

test : ON

Battery operation
time : xxx min.

Normal operation

load power xx%

Normal operation

load power xx%

Battery capacity

test : xxx

Data stored

CAUTION!

To avoid battery damage, allow a minimum of 16 hours of UPS operation over a 3-month period
for batteries to charge to a sufficient level.