Frame preparation, Horizontal adjustment & lockdown, Cover installation – HES 9400 User Manual
Page 4

4
Frame Preparation
9"
[228.6]
CE
N
TERLINE OF L
ATCHBO
LT
THIS EDGE TOWARD DOOR
2X MOU
N
TING HOLE
LOC
ATIONS FOR
1/4-20 UNC CAP SCREWS
7/8"
[22.2]
4-1/8" [1
04.8]
1-3/4"
[44.5]
CLEARANCE FOR POWER WIRING
Final
Lo
ckdown
Feature
10-32 UNF or 10-24 UNC (optional)
1
-1/
16"
[2
7.0]
4-1/8" [1
04.8]
4X
[33.3]
1-5/
16"
[33.3]
1-5/
16"
1. Loosen the two #1/4-20 mounting screws.
2. Adjust strike to appropriate horizontal position.
3. Tighten the two #1/4-20 mounting screws.
4. Lock down adjustment by tightening the setscrews.
5. Install the #10-32 UNF or 10-24 UNC lockdown
screw (optional).
HORIZONTAL ADJUSTMENT & LOCKDOWN
Inches [mm]
3/4” [19]
CLEARANCE FOR LBM/LBSM WIRING
1/2” [12.7]
© 2009 HES, Inc.
3075006.002 rev B
LOCKDOWN
SCREW
(optional)
SETSCREW
LOCATION
SETSCREW
LOCATION
MOUNTING
SCREW
MOUNTING
SCREW
COVER INSTALLATION
Attach the cover using the #6-32 x 1/4” Cover Screws