beautypg.com

Installation directions, Prepare strike, Finish installing – HES 5200 User Manual

Page 2: Prepare frame, Brown blue yellow, White orange green

background image

2

Installation Directions

CAUTION! Before connecting any device at the installation site, verify input voltage using a multimeter.

Many power supplies and low voltage transformers operate at higher levels than listed. Any input voltage exceeding

10% of the solenoid rating may cause severe damage to the unit and will void the warranty.

Brown

Blue

Yellow

DIAGRAM 2: 12V to 24V CONVERSION

4. Prepare frame using appropriate template for your

faceplate (see pages 3-6).

5. Attach faceplate to strike body

1. Select the appropriate Plug In Connector that matches

system power and electrically connect as illustrated in

Diagram 2. For 12V AC/DC or 16V AC, the pigtail marked “12

VDC” should be used. For 24V AC/DC, the pigtail marked

“24 VDC” should be used.

2. Verify that the strike is in the correct mode of operation.

This unit ships in Fail Secure mode. If you need to convert to

fail safe see Diagram 5.

3. If using Latchbolt Monitor (LBM) or Latchbolt Strike

Monitor (LBSM) see Diagram 3 & 4 to complete wiring.

Prepare Strike

6. Connect wires from the power source to the strike.

7. Install the electric strike unit in jamb cutout using the

screws provided with the faceplate option kit. If horizontal

adjustment is needed, see Diagram 6.

Finish Installing

Prepare Frame

LBM WIRING

White

Orange

Normally Open

Green

Normally Closed

Common

Blue

Yellow

LBSM WIRING

Brown

Normally Open

Normally Closed

Common

White

Orange

Green

DIAGRAM 3: LATCHBOLT MONITOR

DIAGRAM 4: STRIKE MONITOR

RED

RED/GREEN

BLACK

VIOLET

RED

BLACK

VIOLET

RED/GREEN

IF CONNECTOR IS MISSING

(+ 12 VDC)

(-NEG)

(+ 24 VDC)

(-NEG)

ELECTRIC STRIKE

ELECTRIC STRIKE

CONNECT

TOGETHER

CONNECT

TOGETHER

CONNECT

TOGETHER