CP3636BF Acrylic Transfer Shower Pan Installation Guidelines
02/04
AQUA BATH COMPANY INC.921 Cherokee Ave.Nashville, TN 372071-800-232-2284Fax (615) 227-9446
Page 1
CP3636BF Acrylic Transfer Shower Pan Installation Guidelines
Installation Requirements
•
Check to make sure that rough in dimensions of framing studs matches the outside dimensions (OD) of the
acrylic pan (37 1/4" x 38 1/2", reference "top view" in illustration box below) See Figures #1 and #2 on Page 2
•
Pre-Drill holes in acrylic pan top flanges (matching location of stud supports) for connection of acrylic pan to
stud supports. The diameter of holes drilled should be the proper size for diameter of fasteners to be used (reference
"detail at top flange" in illustration box below) See Figure #3 on Page 2
•
Check to make sure that area where pan is to be installed is level, free of debris, and that the area where the drain
is placed has been chipped out (1/2" deep x 10" diameter). See Figure #4 on Page 2
Steps For The Installation Process
•
Dry fit acrylic pan into its installation position to ensure proper dimensional fit, that chipped out area at drain
location is in correct location and that acrylic pan sits level. See Figure #5 on Page 2
•
After dry fit is complete, you may grout acrylic pan into place. Be sure to use a Non-Shrink Grout and mix it
extra wet. After grout is place, make sure pan is level left to right and front to back along top flanges (do not level
at floor of unit as it is angled to direct water to the drain). All acrylic pans have a 2-degree angle built into them
to help direct water to the drain (reference "side view" in illustration box below). See Figure #6 on Page 2
•
Place a 100lb weight at drain location and additional weights on floor of acrylic pan to help pan adhere to grout.
•
Attach acrylic pan to stud supports through pre-drilled holes with fasteners.
•
Apply a bead of construction adhesive (1/8") at front flange of acrylic pan to attach front of unit to floor.
Detail At Top Flange
Stud Support
Pre-drilled hole for
connection of acrylic
pan to stud supports.
2" Top
Flange
TOP VIEW
FRONT VIEW
RIGHT SIDE VIEW
18"
36" I.D.
38½" O.D.
18"
36" I.D.
¾"
6"
4"
R=½"
1"
¼"
37" 37¼" O.D.
Integral Trench
Drain System
Ribbed Bottom For Slip Resistance
2°