beautypg.com

Cycle stall basic – American Bicycle Security Company Cycle Stall Basic User Manual

Page 4

background image

American Bicycle Security Company

P.O. Box 7359

Ventura, CA 93006

Ph: (800) 245-3723 or (805) 933-3688

Fax: (805) 933-1865

www.ameribike.com

Email:

[email protected]

Cycle Stall Basic

*Tools Needed for Installation

Hammer Drill with 3/8” masonry bit

Socket Wrench 3/8”

Hammer (if installing into concrete with
wedge anchors)

Installation –

Wheel Stops & Delineators

*Site Safety:

Before installation, ensure work site is safe. If
necessary, block off the area to prevent vehicle and
pedestrian access. Use appropriate signage and work
barricades to delineate the work area. Ensure electric
power leads and hand tools are safe, in good working
condition and only used as per manufacturer’s
specifications. Remove any potential trip hazards and
use appropriate personal safety equipment (safety

gloves, safety glasses, safety boots, etc.).

Wheel Stop Installation:

1. Place wheel stop in desired location using setbacks

diagram on page 2 as a guide. Mark holes onto
surface and remove wheel stop.

2. Drill 3/8” holes though asphalt surface.

3. Line up holes in wheel stops with holes in road

surface and use 3/8” socket wrench to secure the
provided anchors.