Operation, Opera t ion – Alamo 7191852C User Manual
Page 68
![background image](/manuals/43776/68/background.png)
OPERATION
PA91 02/08
Operation Section 4-16
© 2009 Alamo Group Inc.
OPERA
T
ION
FRAME ASSEMBLY
•
Inspect condition of mounting frame weldment.
•
Inspect condition of King Post frame.
•
Ensure all bolts and screws are in position and
are properly torqued.
•
Ensure all pins are in place and fastened with
screws.
•
Ensure frame is properly mounted to tractor and
hardware is propely installed and tightened.
OPS-B- 0021_D
BOOM ARM ASSEMBLY
•
Inspect condition of each arm section weldment
•
Ensure all pins are in place.
•
Ensure all bolts and screws are properly installed.
•
Check condition of teflon bushings at boom pivot
points.
•
Ensure each hydraulic cylinder is installed and retained
correctly. Ensure the proper size pins are used to
retain the cylinders in place and are secured properly.
•
Ensure that all joints are lubricated. See Maintenance
Section for Lubrication Chart. OPS-B-022_E
Never attempt to lubricate, adjust, or remove material from the Implement while it is in
motion or while tractor engine is running.
(SG-20)
HYDRAULIC LINE INSPECTION
•
Check for hydraulic leaks along hoses,
cylinders and fittings. IMPORTANT: DO NOT
use your hands to check for oil leaks. Use a
piece of heavy paper or cardboard to check for
hydraulic oil leaks.
•
Inspect the condition of the valve weldment.
•
Ensure fitting is properly connected
•
Inspect condition of nylon bushings.
OPS-B- 0023_E