beautypg.com

Before startup – Karcher BD 530 Bp User Manual

Page 20

background image

– 3

1 Water quantity regulator
2 Switch for brush operations
3 Switch of suction turbine
4 Display

1 Water quantity regulator
2 Main switch
3 Overload fuse
4 Switch of suction turbine

Fasten the pushing handle using the
four screws that have been delivered
and fit the protective caps.

Place long lateral boards of the packag-
ing as a ramp next to the pallet.

Fix the ramp on the pallet with nails.

Place short boards as a support under-
neath the ramp.

Remove the wooden bars in front of the
wheels.

Raise the cleaning head and remove
the cartonage.

Push down the appliance through the
ramp from the pallet.

Insert the vacuum bar into the vacuum
bar suspension in such a manner that
the profiled sheet is positioned above
the suspension.

Tighten the cross-handles.

Insert the suction hose.

The disc brush must be installed before the
initial operation (see "Maintenance work").

Operator console

BD 530 Bp

BD 530 Ep

Before Startup

Unloading

Installing the Vacuum Bar

Install the brush

20

EN