beautypg.com

Allied Telesis AT-FS724L User Manual

Page 24

background image

Installation

16

4. Secure the switch to the rack using 2 screws (not provided) for each side as

shown in Figure 7.

Figure 7 Installing the Switch to the Rack

5. Apply power to the switch by plugging one end of the power cord to the

power receptacle and the other end to a power outlet. Verify that the
POWER LED is green. If the LED is OFF, refer to “Troubleshooting” on
page 19.

Note

The switch performs a self-diagnostic test upon power up. This takes
about 20 seconds to complete.

6. Connect the twisted pair cables to a twisted pair ports on the switch and on

the end-nodes.

7. Power ON the end-nodes connected to the switch.

8. Check that the LINK/ACTIVITY LED for each port on the switch is green.

If a LED is OFF, refer to “Troubleshooting” on page 19.

The switch is now ready for use.