beautypg.com

Obtaining documentation and resources, Obtaining documentation and – Allied Telesis AT-9900s Series Switch User Manual

Page 12

background image

Installation Guide

11

8.

If you disconnected a redundant power supply, reconnect it.

9.

Restart the switch and verify installation with the show log command to
confirm there is no error message about installation in the log file.

If you are connected to the asyn0 port, any error message is displayed
during startup self-tests.

Obtaining Documentation and Resources

The complete document set for AT-9900s Series switches includes:

this Installation Guide

the x900 Series Switch and SwitchBlade

®

x908 Installation and Safety Guide,

which describes how to install the switch and includes important safety and
statutory information

the x900 Series Switch and SwitchBlade

®

x908 Hardware Reference, which

contains detailed information on the switch and its hardware features

the Removable Power Supply and Fan Installation Guide, which describes how to
install power supply units and fan-only modules in the switch

the x900 Series Switch AlliedWare

®

Operating System Software Reference, which

contains detailed information on configuring switches running the
AlliedWare

®

operating system

You can download these documents and updates from

www.alliedtelesis.com/support/software

.

You need Adobe

®

Acrobat

®

Reader

®

software to view, search, or print these

documents. You can download it from

www.adobe.com

.

Other resources

How-To Notes describe a range of standard Allied Telesis solutions, and include
technical tips and guides to configuring specific hardware and software features.
You can download the latest How-To Notes from

www.alliedtelesis.com/resources/literature/howto.aspx

.

MIBs supported by Allied Telesis products can be downloaded from

www.alliedtelesis.com/support/software

.

Microsoft

®

Visio

®

stencils for Allied Telesis products can be downloaded from

www.alliedtelesis.com/resources/images/visio.aspx

.