Obtaining documentation and resources, Obtaining documentation and – Allied Telesis AT-9900s Series Switch User Manual
Page 12

Installation Guide
11
8.
If you disconnected a redundant power supply, reconnect it.
9.
Restart the switch and verify installation with the show log command to
confirm there is no error message about installation in the log file.
If you are connected to the asyn0 port, any error message is displayed
during startup self-tests.
Obtaining Documentation and Resources
The complete document set for AT-9900s Series switches includes:
■
this Installation Guide
■
the x900 Series Switch and SwitchBlade
®
x908 Installation and Safety Guide,
which describes how to install the switch and includes important safety and
statutory information
■
the x900 Series Switch and SwitchBlade
®
x908 Hardware Reference, which
contains detailed information on the switch and its hardware features
■
the Removable Power Supply and Fan Installation Guide, which describes how to
install power supply units and fan-only modules in the switch
■
the x900 Series Switch AlliedWare
®
Operating System Software Reference, which
contains detailed information on configuring switches running the
AlliedWare
®
operating system
You can download these documents and updates from
You need Adobe
®
Acrobat
®
Reader
®
software to view, search, or print these
documents. You can download it from
.
Other resources
How-To Notes describe a range of standard Allied Telesis solutions, and include
technical tips and guides to configuring specific hardware and software features.
You can download the latest How-To Notes from
.
MIBs supported by Allied Telesis products can be downloaded from
Microsoft
®
Visio
®
stencils for Allied Telesis products can be downloaded from