beautypg.com

American Dryer Corp. MDG-75 User Manual

Page 30

background image

26

3. Piping/Connections

ALL components/materials must conform to National Gas Code specifications. It is important that gas

pressure regulators meet applicable pressure requirements and that gas meters be rated for the total amount

of ALL the appliance BTU's being supplied.

The dryer is provided with a 3/4" N.P.T. inlet pipe connection located at the right side of the base of the dryer.

The minimum pipe size (supply line) to the dryer is 3/4" N.P.T. For ease in servicing, the gas supply line of

each dryer must have its own shut-off valve.

The size of the main gas supply line (header) will vary depending on the distance this line travels from the gas

meter or, in the case of L.P. (liquid propane) gas, the supply tank, other gas-operated appliances on the same

line, etc. Specific information regarding supply line size should be determined by the gas supplier.

NOTE: Undersized gas supply piping can create a low or inconsistent pressure which will result in

erratic operation of the burner ignition system.