American Dryer Corp. MDG-75 User Manual

Page 26

background image

22

The only electrical input connections to the dryer are the 3-phase (3ø) power leads (L1, L2, L3, and

sometimes neutral) and ground. Single-phase (1ø) power for the control circuit is done internally to

the dryer. No single-phase (1ø) input connection is required on a 3-phase (3ø) dryer.

For gas dryers manufactured for operation at 3-phase (3ø), the electrical connections are

made at the power distribution block located in the service box at the rear, upper left corner of the

dryer. The ground connection is made to the copper lug also provided in this box. To gain access to

the service box contactor, the service box cover must be removed.