beautypg.com

10 | samlex america inc. samlex america inc. | 11 – Samlex America STS-30 User Manual

Page 11

background image

10 | SAMLEX AMERICA INC.

SAMLEX AMERICA INC. | 11

SecTIOn 3 |

Installation

Fig. 5 Typical Generator / Power Cord

b. Start the generator. There is a pre-programmed 20 to 25 second delay in the transfer

switch. The delay is designed to allow the generator a brief warm-up period. When
the delay completes its cycle the switch should engage and the AC loads should oper-
ate normally. An audible click should sound as the relay energizes.

c. Shut down the generator. As the generator winds down the switch should disengage

without chatter or cycling. An audible click should sound as the relay de-energizes.

d. Switch oN the AC input power from the Utility/Shore Power Cord (rV). Start the gen-

erator. After the pre-programmed delay, the switch should transfer power automati-
cally from the Utility/Shore Power Cord (rV) to the generator. Listen for the audible
click as the relay is energized. Green LeD 1 will be lighted indicating that the relay has
energized. Shut down the generator and disconnect AC input power from the Utility/
Shore Power Cord (rV).

ON

LED1

TERMINALS:

T1 LINE “L”, COMMON
T2 NEUTRAL “N”, COMMON
T3 LINE “L1”, NO
(NORMALLY OPEN)
T4 NEUTRAL “N1”, NO
(NORMALLY OPEN)
T5 LINE “L2”, NC
(NORMALLY CLOSED)
T6 NEUTRAL “N2”, NC
(NORMALLY CLOSED)
T7 (–) INPUT FOR RELAY COIL
T8 (+) INPUT FOR RELAY COIL

T5

T7

T8

T1

T2

T3

20 A

FUSE

INPUT FROM SHORE POWER CORD

TO NORMALLY CLOSED (NC)

CONTACT TERMINALS T5,T6

OUTPUT TO

AC BREAKER

PANEL

INPUT FROM GENERATOR

TO NORMALLY OPEN (NO)

CONTACT TERMINALS T3,T4

30 A MAIN

BREAKER PANEL

30

MAIN

BRANCH CIRCUITS

1 2 3 4 5

T4

T6

SW1

PCB1