beautypg.com

Т³гж 9 – t&mSystems Project 240 User Manual

Page 9

background image

9

OPERATION ATTENTION

6. MACHINE OPERATION

1 Do not open and close the machine frequently. Reopen
should be after 10 seconds.
2 Power supply should match up to the machine.

The machine outfit with ground line, so please plug on

the connected-ground wire-net
4 As formidable shock or impact on machine such as
(thunder shock,halfway signal pause, excess rated signal
input or other interference), the machine will auto-check
and reopen automatically.

3

Project60/Project120