beautypg.com

Installation – Siemens LC258BA90 User Manual

Page 42

background image

42

Installation

The extractor hood is designed to be
mounted on the wall.

During installation, optional accessories may

also require fitting.

Observe the minimum distance between

hob and extractor hood (see ”Safety
instructions”)!

Avoid damaging the sensitive surfaces!

Preparing the wall

RISK OF INJURY,
DAMAGE TO PROPERTY

Before drilling the holes for the designated
installation location, check for concealed
electrical cables and other lines.

The wall must be level and vertical.

The enclosed screws and wall plugs are

suitable for solid brickwork. Use the
appropriate fixing materials for other wall
structures (e.g. plaster board, porous concrete,
poroton bricks).
Ensure that the wall has adequate load
bearing capacity.

Ensure that the depth of the drilled holes

corresponds with the length of the screws.

Ensure that the wall plugs are secure.

Max. weight in kg: 40

Design subject to modification in line with
technical development.

Installation preparations

1. Mark a centre line on the wall from the

ceiling to the lower edge of the extractor
hood.

2. Using the enclosed template, mark

positions for the screws and, to facilitate
attachment, the contour of the attachment
area. The lower edge of the template
corresponds to the lower edge of the
extractor hood.

3. Drill 2x 8 mm holes for attachment of the

extractor hood and 2x 8 mm holes for the
fixing bracket for the flue duct and press in
wall plugs flush with the wall.

4. Screw on the fixing bracket for the flue

duct.

5. Screw on the brackets for the extractor

hood: hand tight, max. 3 Nm.
Ensure that the washers and brackets are
positioned correctly!

0

This manual is related to the following products: