Dake Model H-100 User Manual
Page 5

10/09/07
Dake Power Hammer
5
Set up and Operation of the Dake Power Hammer
J. Make sure the lock screw on the adjustment bottom sleeve is loose.
K. Rotate adjusting screw handle to move the lower die to the upper die.
WARNING !!!!
For safe operation and possible die damage always adjust the gap between the upper die half and the
work piece to a minimum of ¼” before starting motor.
K
J
¼” minimum gap
before starting motor