beautypg.com

American Dryer Corp. AD-24 Phase 7 User Manual

Page 41

background image

113222 - 5

www.amdry.com

37

b. Phase 7 Non-Coin Models

1) Upon completing installation of the replacement microprocessor controller (computer) board,

reestablish power to the dryer.

2) Start the drying cycle by pressing any of the preset cycles in letters A-F.

3) Verify that the applicable indicator lights on the microprocessor controller (computer) board are lit.

(Refer to the illustration below.)