beautypg.com

American Dryer Corp. AD-24 Phase 7 User Manual

Page 40

background image

36

American Dryer Corp.

113222 - 5

SECTION VIII

PROCEDURE FOR FUNCTIONAL CHECK

OF REPLACEMENT COMPONENTS

1. Microprocessor Controller (Computer) Board

a. Phase 7 Coin Models

1) Upon completing installation of the replacement microprocessor controller (computer) board,

reestablish power to the dryer.

2) Start the drying cycle by pressing any temperature selection keys (HI, PP, or LO).

3) Verify that the applicable indicator lights on the microprocessor controller (computer) board are lit.

(Refer to the illustration below.)