5.0 Installation

5.1 General notes on installation

The following points should be taken into account besides the general principles governing
installation work:

- Planners / construction companies or operators are responsible for positioning and

installing products.

5.2 Steam trap testing through ultrasonic measurement

Testing the operation of the steam trap in the installed state is straightforward with the
“ARImetec

®

-S” multifunction tester.

Refer to data sheet „ARImetec

®

-S“.

5.3 Installation position

(refer to Fig. 1 page 4)
The venting valve is operated in a vertical installation position (system connection vertically
downwards). The arrow on the side of the cover (pos. 6) marks the direction of flow.

ATTENTION !
- Remove flange covers if present.
- The interior of valve and pipeline must be free from foreign particles.
- Install at highest point of pipeline system, media supply always from below.

Note installation position with reference to flow, see mark on valve.

- Steam line systems should be designed to prevent water accumulation.
- Lay pipelines so that damaging transverse, bending and torsional forces are

avoided.

- Protect valves from dirt during construction work.
- Connection flanges must mate exactly.
- Valves must not be used to take external forces, e.g. they are not designed for

use as climbing aids, or as connecting points for lifting gear.

- Suitable materials handling and lifting equipment should be used.

See data sheet for weights.

- Centre gaskets between the flanges.
- Precautions against freezing should be taken in any facilities susceptible to

frost.