Chapter 3 operation, General, Chapter 3 – Vaisala RS92-KL User Manual
Page 15: Operation

Chapter 3 ________________________________________________________________ Operation
VAISALA_______________________________________________________________________ 13
CHAPTER 3
OPERATION
This chapter contains information that is needed to operate this product.
General
It is essential that you carry out the pre-launch steps as instructed and
always in the same way. Follow the instructions in the following
sections and refer to
preparation.
The workorder for a sounding is as follows:
1.
Prepare the balloon and optional sounding accessories.
2.
Unpack the radiosonde.
3.
Perform sounding preparations.
4.
Connect the battery.
5.
Launch the radiosonde.
6.
Monitor the sounding with the DigiCORA® Sounding System.
This manual is related to the following products: