Photovoltaic array (pv), Battery bank, Ground rod – Outback Power Systems FLEXpower ONE System Overview User Manual
Page 8: Ac sub-panel (120 vac), Flexware pv8, Page 6, On-grid wiring, Ac distribution panel (main panel), Loads (120 vac), Primary system ground
IMPORTANT: Example only. Actual wiring may vary.
Factory wiring not shown. All configurations must
comply with local and national electric codes. Consult
your local electric authority to ensure compliance.
L1
L2
NEUTRAL
GROUND
GROUND ROD
Primary System
Ground
(Ground Electrode
Conductor)
HOT
NEUTRAL
GROUND
AC Sub-Panel
(120 Vac)
Bypass
Outlet
(RTS)
O
I
O
I
O
I
O
I
O
I
O
I
O
I
O
I
FLEXware
PV8
900-0094-01-00 Rev A.vsd\On Grid Wiring No FNDC\2012-03-02
©2011 OutBack Power Technologies. All Rights Reserved.
N
N
L1
L1
L1
L1
N
N
Page 6
CC
PV Circuit
Breaker
Photovoltaic Array
(PV)
GFDI
MATE
RTS
On-Grid Wiring
AC IN
INV
MAIN----------------
3:02:14P
SUM STATUS SETUP ADV
In 23.2 V 0.0 A
Out 27.6 V 0.0 A
0.000 kW 0.0 kWH
AUX: OFF Sleeping
AC Distribution
Panel
(Main Panel)
(120/240 Vac)
Battery Bank
Vented
Battery
Enclosure
24 or 48 Vdc
60 A Circuit
Breaker
(Maximum)
Connects to the terminal on the
circuit breaker that is opposite
the inverter DC cable.
1
1
Output
Input
L1
Loads
(120 Vac)
Negative
Positive
Ground
DC LEGEND
Neutral
HOT L1
Ground
AC LEGEND
L1