Photovoltaic array (pv), Battery bank, Ground rod – Outback Power Systems FLEXpower ONE System Overview User Manual

Page 8: Ac sub-panel (120 vac), Flexware pv8, Page 6, On-grid wiring, Ac distribution panel (main panel), Loads (120 vac), Primary system ground

background image

IMPORTANT: Example only. Actual wiring may vary.

Factory wiring not shown. All configurations must

comply with local and national electric codes. Consult

your local electric authority to ensure compliance.

L1

L2

NEUTRAL

GROUND

GROUND ROD

Primary System

Ground

(Ground Electrode

Conductor)

HOT

NEUTRAL

GROUND

AC Sub-Panel

(120 Vac)

Bypass

Outlet

(RTS)

O

I

O

I

O

I

O

I

O

I

O

I

O

I

O

I

FLEXware

PV8

900-0094-01-00 Rev A.vsd\On Grid Wiring No FNDC\2012-03-02

©2011 OutBack Power Technologies. All Rights Reserved.

N

N

L1

L1

L1

L1

N

N

Page 6

CC

PV Circuit

Breaker

Photovoltaic Array

(PV)

GFDI

MATE

RTS

On-Grid Wiring

AC IN

INV

MAIN----------------

3:02:14P

SUM STATUS SETUP ADV

In 23.2 V 0.0 A
Out 27.6 V 0.0 A

0.000 kW 0.0 kWH

AUX: OFF Sleeping

AC Distribution

Panel

(Main Panel)

(120/240 Vac)

Battery Bank

Vented

Battery

Enclosure

24 or 48 Vdc

60 A Circuit

Breaker

(Maximum)

Connects to the terminal on the
circuit breaker that is opposite
the inverter DC cable.

1

1

Output

Input

L1

Loads

(120 Vac)

Negative

Positive

Ground

DC LEGEND

Neutral

HOT L1

Ground

AC LEGEND

L1

N