With flexnet dc), Photovoltaic array (pv), Battery bank – Outback Power Systems FLEXpower ONE System Overview User Manual
Page 7: Ac distribution panel (main panel), Ac sub-panel (120 vac), Flexware pv8 combiner box, Page 5, On-grid wiring, Loads (120 vac), Ground
IMPORTANT: Example only. Actual wiring may vary.
Factory wiring not shown. All configurations must comply
with local and national electric codes. Consult your local
electric authority to ensure compliance.
(with FLEXnet DC)
L1
L2
NEUTRAL
GROUND
60 A Circuit
Breaker
(Maximum)
AC Distribution
Panel
(Main Panel)
(120/240 Vac)
GROUND ROD
Primary System
Ground
(Ground Electrode
Conductor)
HOT
NEUTRAL
GROUND
AC Sub-Panel
(120 Vac)
Bypass
Output
Input
Outlet
(RTS)
O
I
O
I
O
I
O
I
O
I
O
I
O
I
O
I
FLEXware PV8
Combiner Box
Battery
Status
900-0094-01-00 Rev A.vsd\On Grid Wiring\2012-03-02
©2011 OutBack Power Technologies. All Rights Reserved.
N
N
L1
L1
L1
L1
N
N
Page 5
CC
PV Circuit
Breaker
Photovoltaic Array
(PV)
GFDI
Negative
Positive
Ground
DC LEGEND
Neutral
HOT L1
Ground
AC LEGEND
L1
N
MATE
RTS
On-Grid Wiring
AC IN
INV
MAIN----------------
3:02:14P
SUM STATUS SETUP ADV
In 23.2 V 0.0 A
Out 27.6 V 0.0 A
0.000 kW 0.0 kWH
AUX: OFF Sleeping
Battery Bank
Vented
Battery
Enclosure
24 or 48 Vdc
1
Connects to the terminal on the
circuit breaker that is opposite
the inverter DC cable.
L1
1
Loads
(120 Vac)