beautypg.com

Functional test, Installation – Outback Power Systems GFX Series Inverter/Charger Installation Manual User Manual

Page 36

background image

Installation

34

900-0113-01-00 Rev A

Functional Test

Once the mounting, wiring, and other installation steps are completed, proceed to the GFX Series
Operator’s Manual
. The Operator’s Manual has steps for powering up and performing a functional test
on the inverter system, as well as powering down and adding new devices to an existing system.

Refer to the system display manual for programming instructions and menus.