beautypg.com

Dee Zee DZ370601 User Manual

Page 4

background image

SIDE BAR

CHEVY AVALANCHE 02-10

Read the instructions completely before you begin the installation. NOTE: Pictures
are for reference only, actual brackets may be different. Installation is the same

PARTS LIST
(2) SIDE TUBES WITH STEPS

(4) ½” x 2” HEX HEAD BOLTS

(2) FRONT MOUNT BRACKETS

(10) ½” FLAT WASHERS

(2) REAR MOUNT BRACKETS

(10) ½” LOCK WASHERS

(2) CENTER MOUNT BRACES

(2) 8-1.25mm x 25mm HEX BOLTS

(6) M12-1.75 x 120mm HEX HEAD BOLTS(ONLY FOR 00-06 MODEL
(2) 8mm x 24mm x 2mm FLAT WASHERS
(2)

8mm

LOCK WASHERS

PROCEDURE
1. Begin installation by working on driver side of the vehicle (see Figures 1.1 – 1.4).

2. From underneath truck, loosen and remove body mount bolts that run upward through mounts into

floorboard. Attach and secure Front Mount Bracket to underside of vehicles front body mount (see
Figure 1.2) with (1) M12 – 1.75 x 120mm bolt (For 07-on models, use the factory bolt on the
vehicle
), (1) ½” split lock washer, and (1) ½” flat washer. Hand Tighten.


3. Attach and secure Rear Mount Bracket to underside of vehicles rear body mount as shown in Figure

1.4, in same manner as the front. Repeat for Center Brace, (see Figure 1.3).


4. Attach Side Tube to Front and Rear Brackets using (1) ½” x 2” bolt, (1) ½” lock washer and (1) ½” flat

washer for each bracket and hand tighten. Fasten Center Brace to Side Tube using (1)

8mm x 25mm

Hex Bolt

, (1) 8mm Lock Washer and (1)

8mm

Flat Washer. Adjust Side Tube so that it is level and

centered, and tighten all bolts to complete the driver-side assembly.


5. Repeat process for passenger side of vehicle to complete installation.





Page 2 of 3