Maintenance checklist – Ashland I-180TS User Manual
Page 37

7
MAINTENANCE CHECKLIST
. Grease all zerks.
a)
Every 5 hours of operation.
b) See Lubrication Points section on next page.
. Greasing the hubs.
a) Re-pack wheel bearings after 600 hrs of operation.
b)
Completely clean grease out of hub and bearings every 1200 hours of opera
tion.
. Check tire pressure.
a)
29.5 – 25, 28-ply tire requires a tire pressure of 45-50 psi.
If pressure drops, first secure valve stem, and if pressure continues to drop,
contact Ashland Industries.
4. Check all pins for signs of wear.
a)
Daily
5. Check and retighten all bolts.
a)
After initial 10 hours of use.
b)
Again after 50 hours of use.
c)
See Torque Specifications on next page.
6. Inspect cutting edges.
a)
Daily
b)
Replace cutting edges when center blade has been worn to approximately 6” and side edges
worn to approximately 4”.
CAUTION! Failure to replace worn cutting edges may result in unnecessary
wear to the earthmover sides and floor.
Note: Please specify left or right “L” shaped cutting edges when ordering replacements.