Installation instructions, Final setup, Warning – GE DCVH480EKWW User Manual
Page 24
Installation Instructions
24
LEVEL THE DRYER
Stand the dryer upright near the final location
and adjust the four leveling legs at the corners
to ensure that the dryer is level from side to side
and front to rear.
Raise
Lower
PLUG DRYER IN
Ensure proper
ground exists
before use.
1
FINAL SETUP
2
DRYER STARTUP
Press the POWER button.
NOTE: If the dryer has been exposed to
temperatures below freezing for an extended
period of time, allow it to warm up before pressing
POWER. Otherwise, the display will not come on.
The dryer is now ready for use.
SERVICING
WARNING –
Label all wires prior
to disconnection when servicing controls. Wiring
errors can cause improper and dangerous
operation after servicing/installation.
For replacement parts and other information,
refer to the back cover for servicing phone
numbers.
4
GROUNDING INSTRUCTIONS
This appliance must be grounded. In the event
of malfunction or breakdown, grounding will
reduce the risk of electric shock by providing
a path of least resistance for electric current.
This appliance is equipped with a cord having an
equipment-grounding conductor and a grounding
plug. The plug must be plugged into an appropriate
outlet that is properly installed and grounded in
accordance with all local codes and ordinances.
3
NOTE: Stacking installations may require a power
cord up to 6 feet in length.