Without, Installation preparation preparation, An accessory storage drawer – GE PSB9120DFBB User Manual
Page 8: Caution, Precaución
8
Installation Preparation
Preparation
WITHOUT
an Accessory Storage Drawer
PREPARE THE OPENING (cont.)
Installation under a GE/Monogram
Microwave Oven and over a Warming
Drawer:
NOTE: Additional clearances between the cutouts
may be required. Check to be sure the oven
supports above the Warming Drawer location
do not obstruct the required interior depth
and height. See Warming Drawer installation
instructions for details.
CAUTION:
For personal safety, the
mounting surface must be capable of supporting
the cabinet load, in addition to the added
weight of this approximate 80-pound oven, plus
additional oven loads of up to 50 pounds or a
total weight of 130 pounds.
PRECAUCIÓN:
Para seguridad
personal, la superficie de montaje debe poder
soportar la carga del gabinete, además del peso
aproximado de 80 libras del horno, más las
cargas adicionales del horno de hasta 50 libras
o un peso total de hasta 130 libras.
Construct Solid
Bottom Min.
3/8s Plywood
Supported by
2 x 4 or 2 x 2
Runners all
Four Sides
30s
23-1/2s
25-1/4s
17-1/2s
2s Min.
(3
s
Recommended)
Per Oven
Requirement
3.5
s
Min.
(4.5
s
Recommended)
PREPARE THE OPENING (cont.)
Installation over another GE/Monogram
Under-the-Counter (UTC) oven:
,I\RXDUHPRXQWLQJDQ8QGHUWKH&RXQWHU
GE/Monogram oven over another, use the
dimensions shown. The middle rail separating
the two openings may need to be larger than
the 2s minimum shown.
30s
23-1/2s
25-1/4s
17-1/2s
2
s
Min.
(3
s
Recommended)
Construct Solid
Bottom Min.
3/8s Plywood
Supported by
2 x 4 or 2 x 2
Runners all
Four Sides
17-1/2s
Per Warming
Drawer
Requirement