beautypg.com

Without, Installation preparation preparation, An accessory storage drawer – GE PSB9120DFBB User Manual

Page 8: Caution, Precaución

background image

8

Installation Preparation

Preparation

WITHOUT

an Accessory Storage Drawer

PREPARE THE OPENING (cont.)

Installation under a GE/Monogram

Microwave Oven and over a Warming

Drawer:

NOTE: Additional clearances between the cutouts

may be required. Check to be sure the oven

supports above the Warming Drawer location

do not obstruct the required interior depth

and height. See Warming Drawer installation

instructions for details.

CAUTION:

For personal safety, the

mounting surface must be capable of supporting

the cabinet load, in addition to the added

weight of this approximate 80-pound oven, plus

additional oven loads of up to 50 pounds or a

total weight of 130 pounds.

PRECAUCIÓN:

Para seguridad

personal, la superficie de montaje debe poder

soportar la carga del gabinete, además del peso

aproximado de 80 libras del horno, más las

cargas adicionales del horno de hasta 50 libras

o un peso total de hasta 130 libras.

Construct Solid

Bottom Min.

3/8s Plywood

Supported by

2 x 4 or 2 x 2

Runners all

Four Sides

30s

23-1/2s

25-1/4s

17-1/2s

2s Min.

(3

s

Recommended)

Per Oven

Requirement

3.5

s

Min.

(4.5

s

Recommended)

PREPARE THE OPENING (cont.)

Installation over another GE/Monogram

Under-the-Counter (UTC) oven:

‡,I\RXDUHPRXQWLQJDQ8QGHUWKH&RXQWHU

GE/Monogram oven over another, use the

dimensions shown. The middle rail separating

the two openings may need to be larger than

the 2s minimum shown.

30s

23-1/2s

25-1/4s

17-1/2s

2

s

Min.

(3

s

Recommended)

Construct Solid

Bottom Min.

3/8s Plywood

Supported by

2 x 4 or 2 x 2

Runners all

Four Sides

17-1/2s

Per Warming

Drawer

Requirement

This manual is related to the following products: