beautypg.com

Without, Installation preparation preparation, An accessory storage drawer – GE PSB9120DFBB User Manual

Page 6

background image

6

Installation Preparation

Preparation

WITHOUT

an Accessory Storage Drawer

PREPARE THE OPENING (cont.)

Installation over a GE/Monogram

Warming Drawer:

NOTE: Additional clearances between the cutouts

may be required. Check to be sure the oven supports

above the Warming Drawer location do not obstruct

the required interior depth and height. See Warming

Drawer installation instructions for details.

30s

23-1/2s

25-1/4s

17-1/2s

2

s

Min.

(3

s

Recommended)

Per Warming

Drawer

Requirement

Construct

Solid Bottom

Min. 3/8s

Plywood

Supported

by 2 x 4 or 2 x

2 Runners all

Four Sides

PREPARE THE OPENING

The Advantium 120V can be installed in

combination with other GE/Monogram appliances.

Always follow each product’s Installation

Instructions to complete the installation.

Single Advantium 120V Installation:

Order a 30s wide single oven cabinet or cut the

opening in a wall to the dimensions shown.

‡$OORZs case trim overlap on the sides,

1-1/16s overlap on the top and 7/8s overlap

on the bottom of the opening for all models.

‡2YHQRYHUODSVZLOOFRQFHDOFXWHGJHVRQDOOVLGHV

of the opening.

When installed over a single oven or a warming

drawer, allow at least 2s between the two

openings. This separation will provide clearance

for bottom overlap of the Advantium 120V and the

other appliance overlaps.
Construct a solid oven floor of 3/8s min. thick plywood

supported by 2 x 4 or 2 x 2 runners on all sides.
‡7KHVXSSRUWPXVWEHOHYHODQGULJLGO\PRXQWHG

flush with the bottom edge of the cutout.

30s

23-1/2s

25-1/4s

17-1/2s

Construct

Base

Min. 3/8s

Plywood

Supported

by 2 x 4 or

2 x 2 Runners

all Four Sides

This manual is related to the following products: