Without, Installation preparation preparation, An accessory storage drawer – GE PSB9120DFBB User Manual
Page 6
6
Installation Preparation
Preparation
WITHOUT
an Accessory Storage Drawer
PREPARE THE OPENING (cont.)
Installation over a GE/Monogram
Warming Drawer:
NOTE: Additional clearances between the cutouts
may be required. Check to be sure the oven supports
above the Warming Drawer location do not obstruct
the required interior depth and height. See Warming
Drawer installation instructions for details.
30s
23-1/2s
25-1/4s
17-1/2s
2
s
Min.
(3
s
Recommended)
Per Warming
Drawer
Requirement
Construct
Solid Bottom
Min. 3/8s
Plywood
Supported
by 2 x 4 or 2 x
2 Runners all
Four Sides
PREPARE THE OPENING
The Advantium 120V can be installed in
combination with other GE/Monogram appliances.
Always follow each product’s Installation
Instructions to complete the installation.
Single Advantium 120V Installation:
Order a 30s wide single oven cabinet or cut the
opening in a wall to the dimensions shown.
$OORZs case trim overlap on the sides,
1-1/16s overlap on the top and 7/8s overlap
on the bottom of the opening for all models.
2YHQRYHUODSVZLOOFRQFHDOFXWHGJHVRQDOOVLGHV
of the opening.
When installed over a single oven or a warming
drawer, allow at least 2s between the two
openings. This separation will provide clearance
for bottom overlap of the Advantium 120V and the
other appliance overlaps.
Construct a solid oven floor of 3/8s min. thick plywood
supported by 2 x 4 or 2 x 2 runners on all sides.
7KHVXSSRUWPXVWEHOHYHODQGULJLGO\PRXQWHG
flush with the bottom edge of the cutout.
30s
23-1/2s
25-1/4s
17-1/2s
Construct
Base
Min. 3/8s
Plywood
Supported
by 2 x 4 or
2 x 2 Runners
all Four Sides