Figure 33. connecting cross-connect patch cords – ADC FPL Series User Manual
Page 31
![background image](/manuals/38237/31/background.png)
ADCP-90-328 • Issue 2 • November 2005
Page 31
© 2005, ADC Telecommunications, Inc.
1. Open the front cover of both the FOT equipment and OSP-dedicated FPL panel.
2. Connect the cross-connect jumper to the appropriate bulkhead adapter/receptacle at the
front side of the first FPL panel as shown in
3. Use the retainers at the left and right sides of the FPL panel to route patch cords away from
the front side of the FPL panel.
4. Route patch cord from the first FPL panel to the second FPL panel.
5. Connect the cross-connect jumper to the appropriate bulkhead adapter/receptacle at the
front side of the second FPL panel as shown in
6. Close the front covers on both FPL panels and latch.
Figure 33. Connecting Cross-Connect Patch Cords
Danger: Infrared radiation is invisible and can seriously damage the retina of the eye. Do not
look into the optical bulkhead of an operational transmitter or into the receiver end of an active
fiber. A protective cap or hood MUST be immediately placed over any radiating bulkhead
adapter/receptacle or optical fiber connector to avoid the potential exposure to dangerous
infrared optical radiation. The protective cover also prevents dirt particles from entering the
connector.
Note: If using biconic or ST receptacles, install a 0 dB build-out to permit installation of
the patch cord.
Note: For better access to the vertical cable guides, the patch cord shield may optionally
be removed during installation, as shown in
42
48
54
60
66
72
41
47
53
59
65
71
40
46
52
58
64
70
39
45
51
57
63
69
38
44
50
56
62
68
42
48
54
60
66
72
12
18
24
30
36
6
11
17
23
29
35
5
10
16
22
28
34
4
9
15
21
27
33
3
8
14
20
26
32
2
PATCH
CORDS
PATCH
CORD
SHIELD
PATCH
CORD
SHIELD
PATCH
CORDS
17836-A