Installation, Fully automatic charging overview continued, Owner's periodic maintenance guide – ProMariner ProMite User Manual
Page 7
5
P r o M i t e O v e r v i e w / I n s t a l l a t i o n G u i d e l i n e s
14
13
12
11
14.1V
13.5V
Charging
Conditioning
Maintenance / Float Mode
Typical Average Voltage
V
o
lts
Note: The only LED Indicator that will be on during the maintenance mode will
be the green "Power" LED indicator.
Installation
All ProMite Battery Chargers are designed to be permanently mounted on-board,
and can be mounted vertically or horizontally.
Always mount your ProMite Charger in a compartment area that can be properly
ventilated during use.
Do NOT mix battery types on-board. All batteries should be of the same age
and in good operating condition.
Do NOT make any electrical connections to the ProMite or batteries until the
following steps are completed:
11 Easy to follow installation steps:
1. Select a mounting location that allows for free air ventilation with a minimum of 8 inches
of clear unobstructed space around and infront of the ProMite On-board Marine Battery
Charger. Open all battery and engine compartments and ventilate for at least 15 minutes
before starting the installation of the ProMite Charger.
Fully Automatic Charging Overview Continued
ProMite Float / Maintenance - Green LED Only On
During this mode the red "Charging" LED will turn off indicating that the charging
process is over and the charger is now maintaining your batteries on-board. Only
the green LED will remain on, indicating Power On / Float-Maintenance mode.
A precision 13.5 volts finishing voltage that maintains each battery (step down
voltage regulation mode) which is perfect for short or long storage periods and
will never overcharge your batteries.
10
M a i n t e n a n c e
Owner's Periodic Maintenance Guide
Item:
Process:
When:
Battery Connections
Clean and tighten all battery connections. Follow battery
manufacturer's instructions for cleaning a battery. Clean all
battery terminals with a wire brush where required and tighten
all battery connections.
Monthly
Item:
Process:
When:
Battery Electrolyte
Per battery manufactures instructions monitor and maintain
proper levels of distilled water in each battery.
Monthly
Item:
Process:
When:
ProMite DC Output Wiring
Visually inspect all wiring for cuts and abrasions. Contact
ProMariner if charger needs to be serviced with new wiring.
Monthly
Item:
Process:
When:
AC Power Cord and Mounting Hardware Inspection
Process: Visually inspect the AC power cord. Confirm ground
blade is present and all plug blades are in good conditions
and not bent out of place.
Check all mounting hardware to ensure there is no loose
hardware. Tighten were required.
Monthly