Demand value measurement: demand range – KYORITSU 6300 Quick Manual User Manual
Page 18

Safety first!
Turning on the instrument
Basic setting
Wiring
Confirmation of
instantaneous value
Setting for demand
measurement
Demand value
measurement
DEMAND
range
7. Demand value measurement:
DEMAND
range
(Section 8)
● Measurement flow chart
● Displayed items on
DEMAND
range
Displayed parameters
Unit
Target value
W
Predicted value
W
Present value
W
Load factor
%
Remaining time
-
Max. demand value
W
Date and time when max. demand value measured
-
SET UP
range
“Setting 13” Demand interval
“Setting 14” Demand start time & date
(to start measurement at set time & date)
“Setting 15” Demand stop time & date
(to stop measurement at set time & date)
“Setting 16” Demand target value
“Setting 17” Demand inspection cycle
“Setting 18” Reset of demand value
W
range
SET UP
range
“ Setting 01” Wiring
“ Setting 02” Voltage range
“ Setting 03” Current range
“ Setting 04” Clamp sensor
“ Setting 05” VT ratio (if necessary)
“ Setting 06” CT ratio (if necessary)
− 16 −