beautypg.com

Operating instructions – KYORITSU 4120A User Manual

Page 10

background image

― 8 ―

5. OPERATING INSTRUCTIONS

5.1 Initial Checks - To be carried out before any testing.

(1) Test Lead Connection

Insert the lead plug into the connector on the instrument correctly as
shown below.

(2) Wiring Check

Before pressing the "Test Button" always check the LED's for the
following sequence:
P-E Green LED must be ON
P-N Green LED must be ON

Red LED must be OFF

CAUTION

● Always inspect your test instrument and lead accessories for

abnormality or damage. If abnormal conditions exist DO NOT
PROCEED WITH TESTING.

Lead Plug

Fig. 5

● Operating Error of Loop Impedance (61557-3)

Range

20Ω
200Ω
2000Ω

Measuring range to keep

operating error

0.20 ∼ 19.99Ω
20.0 ∼ 199.9Ω
200 ∼ 1999Ω

Maximum percentage

operating error

±30%

The influencing variations used for calculating the operating error are
denoted as follows:
Temperature:0℃ and 40℃
Phase angle :At a phase angle 0゜to 18゜
System frequency:49.5Hz to 50.5Hz
System voltage:230V+10%-15%

This manual is related to the following products: