beautypg.com

KROHNE ALTOFLUX M 900 EN User Manual

Installation instructions, How to use these instructions

background image

Installation instructions

ALTOFLUX M900
ALTOFLUX 3080 K

Electromanetic flowmeters
for particulary applications

GR

How to use these Instructions

The flowmeters are supplied ready for operation.

The primary head must be installed in the pipeline as described in the installation
instructions inside the packing of the primary head.

Storage and transport

Pages 3+4

Installation in the pipeline

Pages 4-5/7-8

Grounding

Page

9

Primary head

Compact flowmeters

Variable area flowmeters

Vortex flowmeters

Flow controllers

Electromagnetic flowmeters

Ultrasonic flowmeters

Mass flowmeters

Level measuring instruments

Communications technology

Engineering systems & solutions

Switches, counters, displays and recorders

Heat metering

Pressure and temperature

DIN A4: 7.10028.31.00

©

KROHNE 03/2003

US size: 7.10028.71.00