beautypg.com

Installation, Installation 3.1 installation – KROHNE H250 M40 NEPSI Ex ia User Manual

Page 15

background image

INSTALLATION

3

15

H250 M40

www.krohne.com

03/2013 - 4002616701 AD H250 M40 NEPSI Ex ia R01 en

Installation

3.1 Installation

Installation and setup must be carried out according to the applicable installation installation
standards by qualified personnel trained in explosion protection. The information given in the
Installation and Operation Instructions and the Supplementary Installation and Operation
Instructions must always be observed.

Variable area flowmeters must be installed in such a way that

• There is no danger from mechanical impact effects.
• There are no external forces affecting the indicator part.
• The device is accessible for any visual inspections that are necessary, and can be viewed from

all sides.

• The nameplate is clearly visible.
• It can be operated from a location with secure footing.

Take special note of the installation position for the H250/H/... with horizontal flow
direction:

In order to comply with thermal parameters and measuring accuracy, flowmeters for horizontal
installation are to be installed in the pipeline so that the display is located on the side of the
measuring tube. The maximum product and ambient temperatures indicated as well as the
measuring accuracy are based on lateral installation of the display.

CAUTION!
The manufacturer is not liable for any damage resulting from improper use or use other than the
intended purpose. This applies in particular to hazards due to insufficient corrosion resistance
and suitability of the materials in contact with product.

AD_H250_M40_NEPSI_Ex_ia_R01_en_4002616701_PRT.book Page 15 Friday, March 8, 2013 11:14 AM